City of Enid, Oklahoma
Home MenuWater Production
The collection system includes approximately 140 producing wells with 200 miles of collection lines, 23 million gallons of storage tanks, seven pumping stations and two treatment plants. The department operates seven days a week to produce safe, potable water for residential, commercial and industrial customers.
2024 Consumer Confidence Report
To view the current Consumer Confidence Report (CCR) visit the link below:
http://sdwis.deq.state.ok.us/DWW/CCReports/OK2002412.pdf
Annual Drinking Report
You can view or download the past and current Annual Drinking Water Quality reports below:
- 2016 Annual Drinking Water Quality Report [PDF]
- 2017 Annual Drinking Water Quality Report [PDF]
- 2019 Annual Drinking Water Quality Report (Calendar Year 2018) [PDF]
- 2020 Annual Drinking Water Quality Report (Calendar Year 2019) [HTML]
- 2021 Annual Drinking Water Quality Report (Calendar Year 2020)[PDF]
- 2022 Annual Drinking Water Quality Report (Calendar Year 2021) [PDF]
- 2023 Annual Drinking Water Quality Report (Calendar Year 2022) [PDF]
- 2024 Annual Drinking Water Quality Report (Calendar Year 2023) [PDF]
*Note that all Reports are for the previous calendar year.
Water Well Maintenance
Water Production has 140 water wells that must be periodically maintained. We are responsible for all the maintenance performed. Maintenance includes pulling pumps & motor assemblies and replacing the pump or motor, rehabbing the condition of the well screen, and disinfecting the well at the well site. We also do all maintenance on the motor control systems and automation of each well.
In the winter when water usage drops to a minimum, wells not in use will be winterized and placed offline. When spring arrives those wells are brought back online. They will be disinfected and put back online to pump into the water collection system.